Remodeling Services in Roswell, GA

From repainting and refinished floors to full kitchen, bath and basement remodels, home projects for Roswell homeowners.

Our services in Roswell

Kitchen remodeling

Bathroom remodeling

Basement finishing and remodeling

Room additions

House building

Staircase remodeling

Interior painting

Exterior painting

Hardwood floor installation

Engineered hardwood installation

Hardwood floor refinishing

LVP flooring installation

Vinyl flooring installation

Laminate flooring installation

Tile flooring installation

Carpet installation

Cosmetic updates and bigger remodels in Roswell

A remodel can mean refreshing what is already there with paint, refinished hardwood or new carpet. It can also mean rebuilding a room with a new layout, cabinets and fixtures. Precision Remodeling takes on both kinds of work in Roswell, and the difference shapes everything from cost and schedule to paperwork. Even cosmetic jobs depend on preparation: patching and priming bare drywall before paint, or making sure a subfloor is flat before new flooring goes down, is what lets the finish hold up.

Roswell draws that line as well. According to the city's permit FAQ, routine maintenance such as painting needs no permit, while installing, altering, repairing or replacing plumbing does. Those permits come from the Building Division of Community Development, and an owner qualifies for one only as a contractor holding a license or as the occupant of the home being altered. Roswell itself is in Fulton County.

For the remodel itself, we start with a visit and then write an estimate that lists the scope in order, the materials and the selections still open. Changes requested along the way are priced and approved in writing before the work is done.

Sewer connections and Fulton County

Additions and new homes that need a sewer connection also involve the county. Fulton County's sewer connection flowchart has the plumber connect to the existing tap and leave it exposed for a county inspection. The county's connection authorization then goes to the city's permitting department before a certificate of occupancy. For a lateral tied into county sewer, the plumber must call the county inspector at least three days before installing the lateral (county lateral requirements).

Roswell services

Whether you are thinking about a fresh coat of paint or a new kitchen, call 404-409-4448. We can talk through the idea, schedule a visit and follow up with a written estimate.