Remodeling Services in Duluth, GA

Bathroom, kitchen and basement remodeling in Duluth, with plumbing, inspections and drywall scheduled so nothing gets closed up too early.

Our services in Duluth

Kitchen remodeling

Bathroom remodeling

Basement finishing and remodeling

Room additions

House building

Staircase remodeling

Interior painting

Exterior painting

Hardwood floor installation

Engineered hardwood installation

Hardwood floor refinishing

LVP flooring installation

Vinyl flooring installation

Laminate flooring installation

Tile flooring installation

Carpet installation

In a bathroom or kitchen remodel, timing matters as much as materials. Walls and ceilings stay open until the plumbing and wiring behind them are ready and checked, and closing them early can mean tearing out brand-new drywall. Precision Remodeling plans Duluth projects with that order in mind, and our work also includes basements, flooring, painting, staircases, additions and new homes.

What needs a permit in Duluth

Duluth is in Gwinnett County, and its Community Development & Engineering Department handles permits. The city's permit table says repairing or replacing a plumbing fixture needs no permit, but fixture work that changes the piping does, and so does every water heater replacement.

So a new faucet or toilet in the same spot is one kind of job, and moving a vanity across the room is another. We note in the estimate which parts of your project fall on which side of that line. A water heater replacement sits on the permit side even when the new tank matches the old one.

Rough inspection before the walls close

On a stand-alone Duluth plumbing permit for new or altered piping, the city's required inspections list calls for a rough inspection before walls or ceilings are covered, and that inspection may also serve as the final. A water heater replacement gets a final inspection.

In practice, that sets the order on a bath or kitchen: demolition, new piping and wiring, inspection, then insulation, drywall, tile, cabinets and paint. The written estimate follows the same sequence and lists the selections needed at each stage, so a late choice of tile or vanity does not hold up the drywall. Basement finishing follows a similar pattern: framing, rough electrical and any plumbing come first, and the finished surfaces go on last.

Duluth services

Call 404-409-4448 to talk about your Duluth project. We can visit, look over the space and prepare a written estimate.